“AN INVESTIGATION OF TIME-COST-RISK TRADE-OFF IN THE INSTALLATION OF X-RAY MACHINE USING RESPONSE SURFACE METHODOLOGY”. Nigerian Journal of Technology, vol. 33, no. 4, Sept. 2014, pp. 482-9, https://doi.org/10.4314/njt.334.848.