[1]
“OPTIMIZATION DESIGN OF GROUND GRID MESH OF 132/33KV SUBSTATION USING ETAP”, NIJOTECH, vol. 35, no. 4, pp. 926–934, Oct. 2016, doi: 10.4314/njt.354.1188.