[1]
“MEDIUM TERM LOAD FORECASTING OF 33 kV LINE LOADING: A CASE STUDY OF OTA 132/33 kV SUB-STATION OGUN STATE, NIGERIA”, NIJOTECH, vol. 43, no. 4, pp. 743 – 753, Jan. 2025, doi: 10.4314/njt.v43i4.14.