“Analysis and Remedies for Factors Responsible for Time Between Overhaul: A Case Study of DO-228 Aircraft Starter Generator” (2022) Nigerian Journal of Technology, 41(4), pp. 767–777. Available at: https://mail.nijotech.com/index.php/nijotech/article/view/2909 (Accessed: 4 June 2026).