“MEDIUM TERM LOAD FORECASTING OF 33 KV LINE LOADING: A CASE STUDY OF OTA 132 33 KV SUB-STATION OGUN STATE, NIGERIA”. 2025. Nigerian Journal of Technology 43 (4): 743 – 753. https://doi.org/10.4314/njt.v43i4.14.