(1)
MEDIUM TERM LOAD FORECASTING OF 33 KV LINE LOADING: A CASE STUDY OF OTA 132 33 KV SUB-STATION OGUN STATE, NIGERIA. NIJOTECH 2025, 43 (4), 743 – 753. https://doi.org/10.4314/njt.v43i4.14.