[1]
2018. DETERMINATION OF AVAILABLE TRANSFER CAPABILITY (ATC) IN A COMPETITIVE ELECTRICITY MARKET USING NIGERIAN 3-BUS AND 14-BUS POWER NETWORK AS CASE STUDY. Nigerian Journal of Technology. 37, 3 (Jul. 2018), 779–785. DOI:https://doi.org/10.4314/njt.373.1787.